首页 试题详情
单选题

当进行每一步的活门测试时,确保没有泄漏,没有腐蚀,没有生锈并且在整个程序结束后再次确认。

AA. While you do each step of the valve test, make sure that there is no leakage, no corrosion, no rust and do the double check AFT the whole procedure again.

BB. While you do one step of the piston test, make sure that there is no leak, no corruption, no rus and do the double check thru the whole procedure again.

CC. While you do each step of the valve test, ensure that there is no leakage, no corruption, no rust and do the double check AFT the whole procedure again.

正确答案:A (备注:此答案有误)

相似试题

  • 单选题

    进行一步活门测试确保没有泄漏没有腐蚀,没有生锈并且在整个程序结束后再次确认。

    答案解析

  • 单选题

    进行活门测试每一个步骤,要确保没有渗漏。

    答案解析

  • 判断题

    气源胶管无破损、开裂、老化情况;各连接部位应不定期进行泄露测试确保密封无泄漏

    答案解析

热门题库